Methanex Relocation Project

TWE provided Construction Materials Testing services on the Methanex Geismar 1 and Geismar 2 relocation project, a one million ton methanol plant that was relocated from Chile. A total of just over 58,000 cubic yards of structural concrete was placed. Services included: deep foundation monitoring and testing, concrete placement testing and inspection, cementitious and epoxy grout testing and inspection and soils compaction inspection and testing.