CLICK TO SHOW SERVICE TABS

Project

I-10 Widening Project – Highland Road to Siegen Lane, Baton Rouge, Louisiana

Bridge replacement over the KCS Railroad and the widening of an existing bridge structure over the Wards Creek Diversion Canal. Also included widening of a segment of Interstate 10 from 4 lanes to 6 lanes. TWE designed new pavement section for the project and new foundations to support the bridge structures. Provided foundation installation monitoring and testing services. Foundations included 72″ dia. X 85 ft deep straight-sided drilled shafts and driven precast concrete piles.

Services Provided: High-Strain Dynamic Deep Foundations Testing and Piling Driving Consultation

Owner: Volkert Engineers