CLICK TO SHOW SERVICE TABS

Project

Confidential Client – TX

TWE has been working with this client at this site for several years. The project involves a geotechnical and environmental investigation to aid in the design and construction phases of a new dock structure. Environmental conditions consisting of buried waste and a groundwater contaminate plume beneath the site are critical factors in this process.

TWE and the design contractor were tasked with developing a plan that would limit the amount of material that would be excavated and be protective for workers during construction. During the construction phase, TWE conducts air monitoring and decontaminates all impacted-equipment, as well as coordinates waste disposal of contaminated material.